Planning, design, and construction process
Optimization – Efficiency – Energy saving
Factory inspection
Wellchosen Environmental Technology’s professional team will conduct a comprehensive assessment at the customer’s factory, led by a senior technical director along with water quality experts and engineers. After on-site sampling and analysis of wastewater characteristics, water source, discharge volume, and local environmental standards, they will develop the most reasonable and optimal solution using the latest environmental standards.
Contract signing and cooperation
Based on factory inspections and professional design results, we provide the best solution for the customer, comparing dimensions such as treatment efficiency, investment cost, and operational expenses. Experts will organize in-depth discussions with the customer’s technical team to ensure the solution is properly understood and meets the customer’s needs.
Construction
During the construction phase, experienced project managers coordinate operations. Chengxing Company’s engineering team strictly controls material and equipment quality to ensure compliance with design specifications. Construction processes include foundation excavation, pool structure building, pipeline trench construction, equipment installation, and automation control system integration.
Acceptance and warranty
After the system is constructed, we will conduct full-scale debugging and trial operations. Independent third-party agencies will be commissioned for effluent quality testing, ensuring continuous monitoring and stable compliance of the system.
Before acceptance, we will prepare complete completion documentation and provide effective on-site practical training to operational personnel.
Case introduction
Wastewater construction project for a large textile factory
Treatment capacity: 5,000 CMD wastewater treatment
Project features: Utilized a two-stage biological treatment method, significantly reducing chemical treatment costs.
Implementation cycle: Took 6 months from signing to completion and acceptance.
Compliance status: Effluent stably meets Vietnam industrial zone discharge standard Grade A.
Learn more
Wastewater construction project for a plain weave factory
Treatment capacity: Wastewater treatment of 1,500 CMD; Reclaimed water volume of 1,200 CMD; Discharged water volume of 300 CMD
Project features: 1. Small area size with large water treatment demands, 2. Requires high-quality treatment water to meet further reclaimed water treatment equipment standards.
Implementation cycle: Took only 4 months from signing to completion and acceptance.
Compliance status: Effluent stably meets Vietnam industrial zone discharge standard Grade A.
Customer evaluation: Reclaimed water quality and volume are stable, fully satisfying the on-site factory requirements without any issues.
Learn more
Business Contact
Contact us now for the most professional water treatment solution advice